This Office and Residential Tower had 27 levels. The foundation required deep excavation, for which monitoring instruments were important.
Encardio-rite’s sister concern Encardio-rite Geosystems LLC in UAE was awarded I&M sub-contract for the monitoring works. The scope of monitoring works included
Good amount of instrumentation were used to monitor the behavior of diaphragm wall and settlement caused due to dewatering and deep excavation. Toe level of D-wall was -20 m and the final excavation level was -12m. The instruments involved in monitoring works included
Dubai, UAE
Dubai, UAE